Card shaped USB drives come in a wide variety of designs, each with different dimensions. Standard card-style USB drives measure 85 x 54 x 2 mm,this is the most pupular stle card usb drive size, Mini card-style USB drives are only half the size of standard models. Round card-style USB drives typically have a diameter of approximately 42 mm.
The MOQ for card-style USB drives varies significantly based on factors such as material, manufacturing process, and supplier scale.
By material category:
– Standard style: MOQ typically ranges from 10 to 50 pcs.
– Complex processes (e.g., multi-color printing): MOQ starts at 100 pcs for custom orders.
– Creative mold-opening designs: Minimum order quantity is 1,000 pcs.
– Metal card USB drives: Standard models: MOQ is typically 100 pcs,Premium models (e.g., electroplating, embossing): MOQ is at least 500 pcs.
– Wooden models: MOQ is generally 100 pcs.
Yes, card-style shape USB drives support USB 3.0 ports. Nearly all card-style USB drive models support USB 3.0/USB 3.1/USB 3.2 ports. When you see a blue port, it indicates a USB 3.0 model. The 3.0 port is a high-speed interface, offering faster read and write speeds compared to 2.0.
The production time for color printing on card-style USB drives is influenced by factors such as process complexity, material type, order volume, and supplier response time. The typical range is 1-15 business days.
1. Design Confirmation Phase (1 day)
Standard design time is 1 day. At YOUSAN Card-Style USB Drive Factory, our design cycle ranges from 1 hour to 1 day, primarily based on client requirements. Designs requiring no revisions can be completed in 1 hour, while those needing adjustments depend on client needs—sometimes involving over 10 revisions.
2. Shell Preparation Stage (1 day)
Plastic materials: Surface cleaning only; pre-treatment time negligible.
Metal materials: Requires sandblasting and primer application (to enhance adhesion), totaling 1-2 days.
3. Color Printing Production Stage (1-7 days)
UV Flatbed Printing:
Small batches (10-100 pieces): Utilizes instant-dry technology. Monochrome printing takes 1-2 days; full-color printing takes 2-3 days (e.g., a factory in Dongguan, Guangdong claims “1-3 days for shipment”).
Large batches (1,000+ pieces): Requires batch printing and quality inspection, taking 5-7 days.
Digital Direct-to-Garment Printing:
Small batches (1-50 pieces): Supports 24-hour rush service, e.g., a Douyin factory demonstrates “30-minute proofing, 1-3 days shipping.”
Standard orders: 3-5 days completion, suitable for personalized designs (e.g., photos, QR codes).
Dye-sublimation transfer:
Metal materials: Requires pre-coating with sublimation layer + high-temperature transfer. MOQ 200 pieces, lead time 7-10 days.